top of page
The Main Street PFAS Treatment Plant is a 6,400-GPM ion-exchange media plant constructed by OCWD that removes PFAS from groundwater produced by wells that supply 60% of the City of Tustin’s drinking water. Design was provided by Jacobs Engineering and construction management by Butier Engineering. Xylem provided the treatment system and IX media.
bottom of page

