Corona del Mar Water Transmission Main

Project Location:

City of Newport Beach

Project Description:

The City’s Water Master Plan identified the need for a new water transmission main from Big Canyon Reservoir to the western side of Corona del Mar. The project provides more than 8,400 linear feet of new transmission line, from 30-inch to 12-inch cement mortar lined and tape wrapped or epoxy coated steel pipes, and relocation of a pressure regulation unit.

Project Justification:

This project constructed over a mile of 30-inch diameter cement and mortar lined steel pipe through the heart of Newport Beach. Main line trenching down MacArthur Boulevard and East Coast Highway created logistical challenges to maintain traffic flow to businesses, schools, regional commuters and adjacent neighborhoods. Extensive traffic control measures included coordinating intermittent night work, brief roadway closures and detours to minimize disruptions. Regular construction updates were published via social media outlets: Facebook and Twitter, email news blasts, project dedicated web page updates, community newsletters and construction letters to residents to kept the public well informed.

Special Circumstances:

The City of Newport Beach completed a preliminary design alignment analysis report in January 2001 for the Big Canyon Reservoir to Corona del Mar Water Main. The report recommended a 30-inch cement and mortar lined, taped and coated steel cylinder transmission main using the street rights-of-way of Pacific View Drive, San Miguel Drive and MacArthur Boulevard. The City also determined a similar 24-inch transmission main on Carnation Avenue from East Coast Highway to Bayside Drive would increase the reliability of the water system and improve fire flow pressure. In addition, the City relocated its Metropolitan Water District (MWD) turnout regulator structure from East Coast Highway to Dahlia Avenue out of the highway right-of-way. The new 30-inch and 24-inch pipelines provide a secondary redundant mainline, which will be a critical facility if a failure of the existing transmission system occurs.

Project Attachments:

n/a

Award Citation::

The City’s Water Master Plan identified the need for a new water transmission main from Big Canyon Reservoir to the western side of Corona del Mar. The project provides more than 8,400 linear feet of new transmission line, from 30-inch to 12-inch cement mortar lined and tape wrapped or epoxy coated steel pipes, and relocation of a pressure regulation unit.

Suggested Award Summary:

The City of Newport Beach completed a preliminary design alignment analysis report in January 2001 for the Big Canyon Reservoir to Corona del Mar Water Main. The report recommended a 30-inch cement and mortar lined, taped and coated steel cylinder transmission main using the street rights-of-way of Pacific View Drive, San Miguel Drive and MacArthur Boulevard. The City also determined a similar 24-inch transmission main on Carnation Avenue from East Coast Highway to Bayside Drive would increase the reliability of the water system and improve fire flow pressure. In addition, the City relocated its Metropolitan Water District (MWD) turnout regulator structure from East Coast Highway to Dahlia Avenue out of the highway right-of-way. The new 30-inch and 24-inch pipelines provide a secondary redundant mainline, which will be a critical facility if a failure of the existing transmission system occurs.

Project Awards

Burris Pump Station Project, Phase 1Skimming the Waters of Newport HaborSunset Ridge ParkLake Forest Sports ParkCoyote Creek Class I BikewayThe Anaheim Regional Transportation Intermodal Center (ARTIC) Corona del Mar Water Transmission MainSanta Ana River Interceptor (SARI Line) Relocation ProjectState Route 57 Northbound Widening (Central Phase)20 Story Office Tower and 8 Story parking Structure @ 650/670 Newport Center DriveTustin Ranch Road ExtensionBalboa Boulevard BeautificationPark PlaceSR 57 Widening North SegmentAnaheim Regional Transportation Intermodal Center (ARTIC)Irvine Regional Park Maintenance Building Replacement ProjectSand Canyon Avenue Grade SeparationSR-57 ImprovementsNewport Forcemain ProjectEmergency Roof Stabilization, Tustin Hangar 1Lower Santa Ana River Reach 9 Phase 2B ProjectNewport Beach Civic Center & ParkCity of San Clemente Recycled Water Expansion ProjectGroundwater Replenishment System Initial ExpansionCerritos Avenue Reconstruction and Sanitary Sewer Improvement Project Bristol Street Improvements Phase IINew Ocelot Exhibit at the Santa Ana ZooNewport Beach's Harbor Litter Removal ProjectBrookhurst Street Widening ProjectI-5/SR-74 Interchange Improvement ProjectOso Creek Multi-Use TrailPCH/Del Prado Street ImprovementsMarina ParkNewland, Edinger, and East Garden Grove Wintersburg Storm Channel Confluence SystemGobernadora Multipurpose BasinLincoln Avenue Widening over the Santa Ana RiverGilbert Street ImprovementsLAGUNA BEACH FESTIVAL OF ARTS FAÇADE/ENTRANCE PROJECTALEGRE AFFORDABLE APARTMENTSCow Camp Road Design – Phases 1A & 1BWest County Connectors ProjectWaste to Energy - Bowerman Power ProjectGlassell Yard Campus Stormwater Low-Impact Development Retrofit ProjectEsencia, Rancho Mission ViejoIrvine Boulevard Pedestrian BridgeOrange County Water District La Palma Groundwater Recharge BasinStanton Central ParkJeffrey Open Space Trail Emerald Bay Entrance WideningPeters Canyon (Wash) Channel Water Capture and Reuse Pipeline Project 91 Express Lanes Pavement Rehabilitation and CMS ReplacementMemory Lane Park, Santa AnaLa Pata Extension Project SR-91 Westbound WideningNewport Beach Country Club Clubhouse400 Spectrum Center Drive Soil Nail WallMyra 3 Stormwater Pump StationSunset/Huntington harbour Dredging and Waterline ProjectHuntington Beach Senior Center In Central ParkNewport Boulevard WideningCrown Valley Park Channel Entry ImprovementsAnaheim Convention Center Betterment VIIMackay ParkTesoro Zone II and Zone B Water FacilitiesPark Avenue Bridge over Grand CanalI-5/La Novia RoundaboutDairy Fork Wetland and Habitat RestorationJeffrey Road Park n' Ride Lot Expansion ProjectTustin-Rose Grade Separation Project, Part of the OCTA OC Bridges Grade Separations ProgramArgyros Girl Scout Leadership CenterWagon Wheel Creek Restoration and Stormwater ManagementOCTA OC Bridges ProgramABC Green Home 3.0 ProjectLaguna Beach Festival of the Arts Grounds RenovationOrtega Highway Emergency Repair ProjectThe Tracks at BreaBaker RanchCity of Buena Park Fire Station No. 61Arlington Drive Bioswale & Dry Weather Diversion ProjectAltair IrvineVillage Pond Park/Veterans Park RenovationMid-Basin Injection: Centennial ParkAgua Chinon CorridorTarbut V’ Torah Phase III & Phase IVRancho Mission Viejo Joint-Use PavilionI-5 HOV Improvement Project between Avenida Pico and Avenida Vista HermosaOrange County Great Park Sports ComplexCrawford Canyon Road Drainage Improvements & ReconstructionSouth Cove DevelopmentGreat Park Ice & FivePoint ArenaLido House HotelBroadcom Corporate Campus (now FivePoint GatewayWest Orange County Water Board Feeder No. 2 RelocationNewhope-Placentia Trunk Sewer Replacement Project State College Boulevard Grade SeparationLos Patrones ParkwayRancho Mission Viejo Multipurpose Path Urth Caffe - OrangeSR91 Widening from SR-55/91 Separation to SR-241/91 SeparationEdwards Lifesciences Parking Structure

Candidate Awards

Natalie A. Meeks, P.E.Tasha M. Kamegai-KaradiYazdan (Yaz) T. Emrani, P.E., Byron Tobey, PE, QSD, LEEP APEric WalkerGidti Ludesirishoti Victoria PilkoPratanu GhoshSteven R MarvinPhil Jones, PE Joshua Nelson, PEVictor AguirreKenneth H. Rosenfield, PEGeorge A. Jurica, PETom BogardRavi Shah, PE, QSP/QSDAmy Choi, EITElizabeth Ruedas, EIT, ENV SPMujahid ChandooRoxanne FollisAmir Aghakouchak, Ph.D., M-ASCE, P.E.Fred MinagarJeffrey Okamoto, PEHarvey GobasChloe GhariosKevin Onuma, P.E.Ryan ChamberlainDr. Adrian MooreMichael Pierce, A.M.ASCERemi Candaele, PE, MS, QSD/QSP, M.ASCEThomas A. Broz, P.E., S.E, F.ASCEKaren Cervantes, S.M.ASCEIsamar Escobar, A.M.ASCEKevin Kondru, P.E., M.ASCEDouglas J. Johnson, P.E., M.ASCEJeremy Redman, PhDChristopher HaireMojgan Hashemi, P.E., M.ASCEOC Report Card Executive CommitteeSteven J. Huff, P.E., M.ASCEWilliam Bennett, P.E., M.ASCEBruce Phillips, P.E.Brad Dybel, PEBryant WongGyssela (Jazzy) Quinabo, E.I.T.Nestor Godinez, PEProfessor Joel LanningElizabeth RuedasDave LoweWei KooBill LawsonAmber GanapathyBob KallenbaughState Senator Josh NewmanGary UrbanDr. Sudarshan KurwadkarClint Isa, PEJason Fix, PEChirath "Chuck" KarunathilakeAmber ShahAshlyn AlexanderJohn C HoganMarionne Philline LapitanDr. C.T. Bathala, PhD, P.E.Kevin Du Mont, P.E.Ziad Mazboudi, P.E., D.WRE, MBADavid Frattone, P.E.Lisa BartlettJennifer BohenGyssela (Jazzy) Quinabo, E.I.T.Andrew Pham, PE, City of IrvineMatthew Cugini, PE, CaltransFarzian Zareian, Ph.D.Thomas T. Kim, PEDon Hoppe, PEDoug Staley, PERavi Shah, PEMark Vukojevic, PEDavid Naish, PhDLacy KellyGary L. Miller, PEKenneth RosenfieldAndrew Easterling, EITSteven L. King, PESteven R. Marvin, PEJose G. Jimenez Jr.
CEC

Contact Us


Please contact the Board of Directors at .(JavaScript must be enabled to view this email address) if you would like to speak with an ASCE OC Branch representative, or the webmaster if you have any questions or comments about this web-site.

ASCE OC Branch

1405 Warner Avenue, Suite B
Tustin, CA 92780

(714) 258-8306

Website

ASCE Los Angeles Section

(714) 258-8306

Website

ASCE National Society

1801 Alexander Bell Drive
Reston, VA 20191

1-800-548-ASCE

Website

Stay Connected


Copyright © 2019 ASCE Orange County, California Branch. All Rights Reserved.

Designed and developed by Jub Jub Interactive.