Cerritos Avenue Reconstruction and Sanitary Sewer Improvement Project

Project Location:

The Cerritos Avenue Reconstruction and Sanitary Sewer Improvement Project (Project) was constructed on Cerritos Avenue between South Brookhurst Street and Gilbert Street in the unincorporated area of Orange County, California.  Cerritos Avenue, to the west of Gilbert Street and east of Brookhurst Street, are in the City of Anaheim (Anaheim) jurisdiction.  The adjacent land use is highly residential with approximately 50 residential units fronting the Cerritos Avenue.  Four residential streets (all stop sign controlled) and two alleys, intersect this 0.5 mile segment of Cerritos Avenue.

Project Description:

Overview.  The Cerritos Avenue Reconstruction and Sanitary Sewer Improvement Project is a joint project between multiple agencies to replace 2,472 feet of undersized sanitary sewer line and make street improvements on Cerritos Avenue between South Brookhurst Street and Gilbert Street.  A Cooperative Agreement was formed and administered by the County of Orange (County) to complete both projects simultaneously, as part of its Street Improvement Project.  This minimized public inconvenience, maximized efficiency, and saved approximately $148,000 due to the elimination of duplicative project costs.

Sanitary Sewer Improvements.  The 0.5-mile section of Cerritos Avenue is located in an unincorporated area of the County.  Under this section of street, the Garden Grove Sanitary District (GGSD), a subsidiary district of the City of Garden Grove, operates and maintains an existing sewer main.  This main sewer line services 40 house connections and street laterals and appurtenances. The GGSD and Anaheim jointly use and share capacity rights in the sanitary sewer system.  In order to mitigate the risk of sanitary sewer overflows and to provide an adequate peak flow capacity in these shared sewers, the two agencies determined it was necessary to replace the existing sewer system.  The Sanitary Sewer Improvement Project addressed the sewer deficiency in capacity and mitigated the risk of sanitary sewer overflows by replacing 2,472 feet of 8-inch vitrified clay pipe (VCP) with 15-inch VCP. 

Street Reconstruction.  The County had plans to reconstruct this same 0.5-mile portion of dilapidated street.  The Project included the removal and reconstruction of existing pavement and adjustment of existing utilities’ valves and manholes to the new street level.  The Street Improvement Project reconstructed the existing pavement, sidewalk, curb and gutters, and driveway approaches to improve access and to meet current Americans with Disabilities Act standards.  Incorporating these amenities provides increased non-motorized mobility and safety along this busy two-lane undivided Secondary Arterial Highway.  This street provides access to an elementary and high school in a low-income, densely populated neighborhood.

Collaboration.  Anaheim and GGSD are participants of a joint sewer agreement providing for cost sharing for jointly used sanitary sewer lines in Cerritos Avenue owned by GGSD.  Anaheim, the GGSD, and the County agreed to include construction of the Cerritos Avenue Sewer Improvement Project as part of the County’s Street Improvement Project.  The County administered the Project through a County-GGSD Cooperative Agreement using a fair share cost proportionate reimbursement agreement. 

Because of this collaboration, the Project minimized inconvenience to the community.  By including new sewer system improvements with street improvements as one project, it eliminated conducting two separate projects and the burdensome construction, traffic, and noise.  The total project cost was $1,500,000. 

Project Justification:

The County, Anaheim, and GGSD participated in the Cerritos Avenue Reconstruction and Sanitary Sewer Improvements Project, located in the unincorporated County area of Southwest Anaheim.  The County, as Lead Agency for construction, combined their street improvement with GGSD and Anaheim’s sanitary sewer improvements to create one project.  Through close coordination and innovative design/planning, under the lead of Anaheim, the City estimates combining projects saved Anaheim and GGSD approximately $148,000 through elimination of usual duplicative pavement, traffic loop replacement, and similar costs.  This collaborative project minimized inconvenience to the public, maximized efficiency, and protected the integrity of the pavement to be reconstructed. 

The 0.5-mile project was constructed on a busy two-lane undivided Secondary Arterial Highway with a history of accidents.  Cerritos Avenue provides access to a school on Gilbert and another one just past Brookhurst Street.  A school zone sign (25 mph speed limit when children are present) is posted for west bound traffic on Cerritos Avenue.  The street also provides direct access to residential driveways, apartments and a church.  The speed limit posted on Cerritos Avenue is 35 mph.  Prior to construction there were no parking restrictions along Cerritos Avenue.  During construction, the County implemented safety measures to minimize accidents including traffic detours, lane closures, flaggers and signage for traffic control.  In addition, the project implemented new traffic patterns during construction to increase motorized and non-motorized vehicles and pedestrian’s safety, including changing the striping from a two lane to a three lane street with a dedicated center turn lane.  A sidewalk, curb and gutter was added to the north side of Cerritos where there was no existing sidewalk.  Carefully planning and fast construction minimized driveways and streets from being blocked.  There were no accidents during the six months of construction project which was completed on July 3, 2014. 

Special Circumstances:

Awards.  Cerritos Avenue Reconstruction and Sanitary Sewer Improvements Project was awarded the American Public Works Association (APWA) Southern California Chapter 2015 BEST Award in the category of Drainage, Water, Wastewater for projects over $200,000.

Project Attachments:

None.

Award Citation::

The Cerritos Avenue Reconstruction and Sanitary Sewer Improvement Project replaced 2,472 feet of sanitary sewer line and made street improvements on Cerritos Avenue between Brookhurst and Gilbert Street in unincorporated Orange County.  Through close coordination and innovative design/planning, the multiple agency joint project, administered by the County, minimized public inconvenience, increased safety, maximized efficiency, and eliminated duplicative costs, thus saving approximately $148,000.

Suggested Award Summary:

The County of Orange/OC Public Works, City of Anaheim, and Garden Grove Sanitary District joined forces to minimize public inconvenience and save tax payer dollars while making needed sanitary sewer and road improvements.  The Cerritos Avenue Reconstruction and Sanitary Sewer Improvements Project took place on Cerritos Avenue between South Brookhurst Street and Gilbert Street in the unincorporated County area of Southwest Anaheim.  The County, as Lead Agency for construction, combined their street improvement with GGSD and Anaheim’s sanitary sewer improvements to create one project. 

The sanitary sewer improvement project addressed the sewer deficiency in capacity and mitigated the risk of sanitary sewer overflows by replacing 2,472 feet of 8-inch vitrified clay pipe (VCP) with 15-inch VCP.  This new system provides adequate peak flow capacity and better service for approximately 40 house connections.

The project also reconstructed the existing pavement, sidewalk, curb and gutters, and driveway approaches to improve access and to meet current Americans with Disabilities Act standards.

Through close coordination and innovative design/planning, the City of Anaheim estimates combining projects saved Anaheim and GGSD approximately $148,000 through elimination of usual duplicative pavement, traffic loop replacement, and similar costs.  This minimized inconvenience to the public, maximized efficiency, and protected the integrity of the pavement to be reconstructed. 

By coordinating these projects, the community was less inconvenienced and tax payer dollars were saved for the community’s benefit. 

Project Awards

Burris Pump Station Project, Phase 1 Skimming the Waters of Newport Habor Sunset Ridge Park Lake Forest Sports Park Coyote Creek Class I Bikeway The Anaheim Regional Transportation Intermodal Center (ARTIC) Corona del Mar Water Transmission Main Santa Ana River Interceptor (SARI Line) Relocation Project State Route 57 Northbound Widening (Central Phase) 20 Story Office Tower and 8 Story parking Structure @ 650/670 Newport Center Drive Tustin Ranch Road Extension Balboa Boulevard Beautification Park Place SR 57 Widening North Segment Anaheim Regional Transportation Intermodal Center (ARTIC) Irvine Regional Park Maintenance Building Replacement Project Sand Canyon Avenue Grade Separation SR-57 Improvements Newport Forcemain Project Emergency Roof Stabilization, Tustin Hangar 1 Lower Santa Ana River Reach 9 Phase 2B Project Newport Beach Civic Center & Park City of San Clemente Recycled Water Expansion Project Groundwater Replenishment System Initial Expansion Cerritos Avenue Reconstruction and Sanitary Sewer Improvement Project Bristol Street Improvements Phase II New Ocelot Exhibit at the Santa Ana Zoo Newport Beach's Harbor Litter Removal Project Brookhurst Street Widening Project I-5/SR-74 Interchange Improvement Project Oso Creek Multi-Use Trail PCH/Del Prado Street Improvements Marina Park Newland, Edinger, and East Garden Grove Wintersburg Storm Channel Confluence System Gobernadora Multipurpose Basin Lincoln Avenue Widening over the Santa Ana River Gilbert Street Improvements LAGUNA BEACH FESTIVAL OF ARTS FAÇADE/ENTRANCE PROJECT ALEGRE AFFORDABLE APARTMENTS Cow Camp Road Design – Phases 1A & 1B West County Connectors Project Waste to Energy - Bowerman Power Project Glassell Yard Campus Stormwater Low-Impact Development Retrofit Project Esencia, Rancho Mission Viejo Irvine Boulevard Pedestrian Bridge Orange County Water District La Palma Groundwater Recharge Basin Stanton Central Park Jeffrey Open Space Trail Emerald Bay Entrance Widening Peters Canyon (Wash) Channel Water Capture and Reuse Pipeline Project 91 Express Lanes Pavement Rehabilitation and CMS Replacement Memory Lane Park, Santa Ana La Pata Extension Project SR-91 Westbound Widening Newport Beach Country Club Clubhouse 400 Spectrum Center Drive Soil Nail Wall Myra 3 Stormwater Pump Station Sunset/Huntington harbour Dredging and Waterline Project Huntington Beach Senior Center In Central Park Newport Boulevard Widening Crown Valley Park Channel Entry Improvements Anaheim Convention Center Betterment VII Mackay Park Tesoro Zone II and Zone B Water Facilities Park Avenue Bridge over Grand Canal I-5/La Novia Roundabout Dairy Fork Wetland and Habitat Restoration Jeffrey Road Park n' Ride Lot Expansion Project Tustin-Rose Grade Separation Project, Part of the OCTA OC Bridges Grade Separations Program Argyros Girl Scout Leadership Center Wagon Wheel Creek Restoration and Stormwater Management OCTA OC Bridges Program ABC Green Home 3.0 Project Laguna Beach Festival of the Arts Grounds Renovation Ortega Highway Emergency Repair Project The Tracks at Brea Baker Ranch City of Buena Park Fire Station No. 61 Arlington Drive Bioswale & Dry Weather Diversion Project Altair Irvine Village Pond Park/Veterans Park Renovation Mid-Basin Injection: Centennial Park Agua Chinon Corridor Tarbut V’ Torah Phase III & Phase IV Rancho Mission Viejo Joint-Use Pavilion I-5 HOV Improvement Project between Avenida Pico and Avenida Vista Hermosa Orange County Great Park Sports Complex Crawford Canyon Road Drainage Improvements & Reconstruction South Cove Development Great Park Ice & FivePoint Arena Lido House Hotel Broadcom Corporate Campus (now FivePoint Gateway West Orange County Water Board Feeder No. 2 Relocation Newhope-Placentia Trunk Sewer Replacement Project State College Boulevard Grade Separation Los Patrones Parkway Rancho Mission Viejo Multipurpose Path Urth Caffe - Orange Environmental Nature Center Preschool Building 16

Candidate Awards

Natalie A. Meeks, P.E. Tasha M. Kamegai-Karadi Yazdan (Yaz) T. Emrani, P.E., Byron Tobey, PE, QSD, LEEP AP Eric Walker Gidti Ludesirishoti Victoria Pilko Pratanu Ghosh Steven R Marvin Phil Jones, PE Joshua Nelson, PE Victor Aguirre Kenneth H. Rosenfield, PE George A. Jurica, PE Tom Bogard Ravi Shah, PE, QSP/QSD Amy Choi, EIT Elizabeth Ruedas, EIT, ENV SP Mujahid Chandoo Roxanne Follis Amir Aghakouchak, Ph.D., M-ASCE, P.E. Fred Minagar Jeffrey Okamoto, PE Harvey Gobas Chloe Gharios Kevin Onuma, P.E. Ryan Chamberlain Dr. Adrian Moore Michael Pierce, A.M.ASCE Remi Candaele, PE, MS, QSD/QSP, M.ASCE Thomas A. Broz, P.E., S.E, F.ASCE Karen Cervantes, S.M.ASCE Isamar Escobar, A.M.ASCE Kevin Kondru, P.E., M.ASCE Douglas J. Johnson, P.E., M.ASCE Jeremy Redman, PhD Christopher Haire Mojgan Hashemi, P.E., M.ASCE OC Report Card Executive Committee Steven J. Huff, P.E., M.ASCE William Bennett, P.E., M.ASCE Bruce Phillips, P.E. Brad Dybel, PE Bryant Wong Gyssela (Jazzy) Quinabo, E.I.T. Nestor Godinez, PE Professor Joel Lanning Elizabeth Ruedas Dave Lowe Wei Koo Bill Lawson Amber Ganapathy Bob Kallenbaugh State Senator Josh Newman Gary Urban Dr. Sudarshan Kurwadkar Clint Isa, PE Jason Fix, PE Chirath "Chuck" Karunathilake Amber Shah Ashlyn Alexander John C Hogan Marionne Lapitan Dr. C.T. Bathala, PhD, P.E. Kevin Du Mont, P.E. Ziad Mazboudi, P.E., D.WRE, MBA David Frattone, P.E. Lisa Bartlett Jennifer Bohen Gyssela (Jazzy) Quinabo, E.I.T. Adeleine J. Tran, P.E. Jared Lindo Janelle Gonzalez Marionne Lapitan, E.I.T., ENV SP Chirath "Chuck" Karunathilake Gabreelle Gonzalez, P.E. George A. Jurica, P.E. Jeff Braun, P.E. Representative Harley Rouda Jeremy R. Squire, P.E. Kathereen Shinkai, P.E. Mobility 21 Douglas J. Sereno, P.E., F.ASCE Dr. Lisa Star, Ph.D., P.E. Lisa M. Penna, P.E., F.ASCE, QSD Michael A. Kraman, P.E. Tapas Dutta, P.E., F.ASCE Raul Omar Rodriguez Mathew Picardal Darlyn Hernandez Keenan Do Guillermo Medina Jesse Bennett Rob Himes Jennifer Marks Andrew Oshrin Sam Ali Stephanie Wiggins Patrick Tierney, P.E. Rudy Emami
CEC {banner_alt}

Contact Us


Please contact the Executive Board of Directors at .(JavaScript must be enabled to view this email address) if you would like to speak with an ASCE OC Branch representative, or the webmaster if you have any questions or comments about this web-site.

ASCE OC Branch

360 E. 1st St., #992
Tustin, CA 92780

(714) 258-8306

Website

ASCE Los Angeles Section

(714) 258-8306

Website

ASCE National Society

1801 Alexander Bell Drive
Reston, VA 20191

1-800-548-ASCE

Website

Stay Connected


Copyright © 2024 ASCE Orange County, California Branch. All Rights Reserved.

Designed and developed by Jub Jub Interactive.